Zodiac Tech Soft
Service / 20 Chandrapur · Maharashtra · India

IT infrastructure and networking for Chandrapur businesses

Surveyed before it is specified. Cabling, switching, wireless and power designed as one system, then installed, labelled, documented and handed over with support terms in writing.

WiredStructured cabling
WirelessAccess points
ChandrapurHeadquarters
Pan-IndiaDelivery
Overview

A network is a drawing before it is a rack

Most network complaints trace back to a decision made before anything was mounted: where the cable could run, where the switch sat, who needed signal in which corner.

A site usually grows its network one urgent purchase at a time — a switch added when a cabin appeared, an access point bought when the signal faded in the warehouse. Each decision was sensible on the day. Together they leave a tangle nobody can describe, and every fault turns into a search for what connects to what.

We work the other way round. The building, the possible cable routes and the people who depend on the connection are surveyed first. The design follows: which rooms get outlets, where access points must sit to cover through walls, how the firewall should separate staff from guests, and how long the UPS has to hold the rack when power drops. Installation then follows the plan, and what was built is written down.

Structured cabling and network rack installation by Zodiac Tech Soft for a Chandrapur site
Infrastructure / rack plate
Scope

What the work covers

One team from cable route to firewall rule. Where a specialist trade is needed, we say so and coordinate with them.

01

Site survey and requirements

A walk-through of the building, existing cabling and equipment in use, recorded before any recommendation is made.

02

Structured cabling

Copper drops, fibre backbone between floors or buildings, patch panels and face plates, every run labelled to match the drawings.

03

Switching and routing

Managed switches with separate network segments, so staff, guests and devices are not sharing one flat address range.

04

Wireless coverage

Access points placed from a coverage review rather than a guess, with spare capacity for the areas that fill at peak hours.

05

Firewall and access policy

Rules that reflect who and what may reach the internet, how remote access is granted, and what is logged for later review.

06

Power and rack build

UPS sizing for the real load and required runtime, power distribution, rack layout and cable management that can be serviced.

Included

Included in every installation

The survey and the documentation are part of the job, not extras raised after the invoice.

  • Site walk and cable route survey
  • Network and IP addressing plan
  • Equipment specification and supply
  • Cabling, termination and labelling
  • Rack build and power distribution
  • Configuration and testing
  • As-built drawings and schedules
  • Handover and support arrangement
Deliverables

What you receive at handover

  • As-built drawings of cabling and outlets
  • IP, VLAN and switch-port schedule
  • Physical labels matching the schedule
  • Configured and tested active equipment
  • Admin credentials and equipment list
  • Written terms for post-handover support
Fit

Who this suits

The right time to design a network is before the ceilings close, or the week after the third unexplained outage.

New offices, clinics and factories before fit-out

Cabling costs far less before ceilings close and furniture arrives than it does to retrofit afterwards.

Sites where the network grew by accident

Daisy-chained switches, unlabelled cable and a wireless name that half the building cannot reach reliably.

Multi-floor or multi-building premises

Where one access point in a corridor does not reach the cabins, and adding another has not solved it.

Teams that inherited a system with no records

The previous installer has gone and nobody can say which cable goes where, or what the admin password is.

01 / ProblemWireless drops in the same rooms every afternoon
Usually placement, channel and wall construction rather than a missing access point. We measure where coverage actually falls short, then move or add access points to fix that specific gap.
02 / ProblemAn outage takes hours to trace
Labelled cabling, a switch-port schedule and drawings that stay current turn a fault into a short check along a known path instead of an afternoon of guessing.
03 / ProblemStaff, guests and devices all share one open network
Separating the network into segments and setting firewall policy limits what an infected laptop or an unauthorised visitor can reach from the same building.
04 / ProblemA power cut takes everything down at once
We size the UPS against the measured load, so the rack either rides out a short cut or has enough time to shut down in order rather than stop mid-write.
Process

How an installation runs

A sequence that keeps the site usable during the work and leaves behind something a future engineer can read.

  1. Step 01

    Walk the site

    Walk the building, inspect existing cabling and equipment, photograph routes and record the constraints.

  2. Step 02

    Draw the design

    Cable schedule, equipment list, IP plan and rack layout, costed together as one proposal.

  3. Step 03

    Install and label

    Cabling and rack work scheduled around working hours, with the site left tidy at the end of each day.

  4. Step 04

    Configure and test

    Switching, wireless, firewall and power checked against the design, with results recorded per link.

  5. Step 05

    Document and hand over

    Drawings, credentials and a walkthrough for whoever will run it, plus the support terms in writing.

Technology

System choices

Equipment is selected per site. What matters is that the result can be maintained by someone other than the person who installed it.

Cabling

  • Structured copper cabling
  • Fibre between buildings
  • Patch panels and labelling
  • Test results per link

Active equipment

  • Managed switches
  • Segmented network ranges
  • Wireless access points
  • Firewall rule sets

Power and continuity

  • UPS sized to the load
  • Rack power distribution
  • Spare capacity for growth
  • Saved device configurations
Outcomes

What changes after handover

A network should stop being a source of interruptions and become part of the background, like electricity.

01

Coverage where the work happens

Calls, files and billing work at the desk, the counter and the far end of the shop floor.

02

Faults found in minutes

Labelled cabling and current drawings turn an outage into a traceable check rather than a search.

03

A system that can be handed over

Credentials, drawings and an equipment list are yours, whichever team maintains it next.

04

Room for the next addition

Spare ports, spare power and a documented plan mean new desks are an addition, not a redesign.

FAQ

Questions we are asked before an installation

Still unsure whether this fits what you are trying to do? Ask directly — you will get an honest answer, including when the answer is no.

Talk to the team
Do you supply the equipment or only install it?

Both are possible. We can specify and supply cabling and active equipment, or install and configure hardware you already own. The specification is not tied to one brand: the choice follows port count, power budget, warranty support and local availability.

How disruptive is the installation?

Cabling is the noisy part. Drilling and ceiling work is scheduled around office hours and, where the site needs it, done in the evening or at a weekend. The working network stays up until the changeover, which is planned before work starts.

Can you reuse our existing cabling?

After testing, yes. Links that pass are kept and documented; the ones that fail are replaced. We show you which is which rather than recommending a full replacement out of convenience.

Do you provide the internet connection?

No, we are not an internet service provider. We design around the circuit you have, configure the firewall to it, and where a second line exists we can set up automatic failover between them.

What happens when something stops working?

Support runs as an agreed arrangement with stated response terms, covering remote checks and on-site visits. Remote monitoring, where the site permits it, and an escalation path you can actually reach are written into that agreement rather than assumed.

Next / Start a conversation

Let's build
what comes next.

Tell us what you are trying to build, launch, grow or fix. You will get a recommended approach, an honest scope and clear next steps.